Heating system halfway there. Ready for sheetrock.

  • 2 days ago
  • 1 min read

The HVAC installation is progressing.  Barry Gearwar has completed a lot of the preliminary plumbing and is at least halfway through the work to install a boiler and radiators in the main house.  The boiler is tiny (I am guessing about 3' high and 2' wide) and 95% efficient. The radiators will be white, modern, flat, steel ones placed mostly under windows.

We have radiant heat in the concrete basement floor, we just have to connect it to the boiler and add a thermostat. 


Sheetrocking was supposed to happen soon but with frost-heaves in Vermont big heavy trucks can’t drive on the Ridge Road for a bit. 

Upstairs hallway at the top of the stairs, reading nook at front near windows (a place for a desk with a view), north bedroom can be seen here, bathroom on the right
Upstairs hallway at the top of the stairs, reading nook at front near windows (a place for a desk with a view), north bedroom can be seen here, bathroom on the right
Same view except south bedroom, you can see the bathroom entrance on the left
Same view except south bedroom, you can see the bathroom entrance on the left
See you next time house
See you next time house

 
 
 